Summary
Overview
Work History
Skills
Additional Information
Languages
Timeline
background-images

Burlacu Luigi Mauritio

Asse,VBR

Summary

Dynamic electrician with extensive experience at NG Elektro, specializing in electrical installations and troubleshooting. Proven ability to enhance operational efficiency through routine maintenance and effective team collaboration. Skilled in interpreting technical schematics and utilizing hand tools, ensuring high-quality workmanship and customer satisfaction in every project.

Overview

2
2
years of professional experience

Work History

Electrician

NG Elektro
01.2025 - 09.2025
  • Installed electrical systems and components following safety protocols and industry standards.
  • Assisted in troubleshooting electrical issues, ensuring minimal downtime during repairs.
  • Conducted routine maintenance on electrical equipment to enhance operational efficiency.
  • Collaborated with team members to complete projects within designated timelines.
  • Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers.

Electrician

EA Projects
10.2024 - 01.2025
  • Installed solar panel systems following safety protocols and technical specifications.
  • Conducted routine maintenance on solar energy equipment to ensure optimal performance.
  • Assisted in diagnosing electrical issues and troubleshooting system malfunctions.
  • Collaborated with team members to complete installations efficiently and effectively.
  • Utilized hand and power tools for precise installation of solar components.
  • Interpreted technical diagrams and schematics to guide installation processes.
  • Contributed to company''s reputation for quality workmanship by consistently delivering visually appealing, well-organized installations.
  • Maintained high levels of customer satisfaction with clear communication regarding system status and addressing concerns promptly.

Electrician

K&F Electro-Techniek
11.2023 - 10.2024
  • Collaborated with team members to complete projects within designated timelines.
  • Installed 120/208 volt systems and 347/600 volt systems.
  • Tested electrical systems functionality and continuity of circuits using devices such as ohmmeters, voltmeters and oscilloscopes.
  • Spliced, joined and connected wire to fixtures and other electrical components.
  • Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.
  • Installed safety and distribution components for electrical systems, such as switches, resistors and circuit-breaker panels.
  • Replaced and repaired lighting fixtures and electrical control and distribution equipment.
  • Repaired or replaced wiring, equipment and fixtures using hand tools and power tools.
  • Troubleshot and repaired malfunctioning systems and components.

Skills

  • Electrical installations
  • Troubleshooting systems
  • Routine maintenance
  • Solar panel installation
  • Technical schematics
  • Circuit testing
  • Hand tool usage
  • Customer communication
  • Team collaboration
  • Voltage systems knowledge
  • Wiring installation
  • Electrical installation
  • Attention to detail
  • Voltmeter use
  • Fire alarm systems

Additional Information

VCA Certificate https://drive.google.com/file/d/19Qxf_2FPs1T0rnkKpQXftIeOIZk4ed3K/view?usp=sharing

Languages

French
Elementary (A2)
English
Bilingual or Proficient (C2)

Timeline

Electrician

NG Elektro
01.2025 - 09.2025

Electrician

EA Projects
10.2024 - 01.2025

Electrician

K&F Electro-Techniek
11.2023 - 10.2024
Burlacu Luigi Mauritio